User:Mliu92/sandbox/Bayshore Cutoff

From Wikipedia, the free encyclopedia
Bayshore Cutoff
View north from Sierra Point from approximately 1915, showing the Bayshore Highway crossing over Tunnel 5 of the Bayshore Cutoff. The Cutoff is the rail line along the western shoreline of San Francisco Bay.
Bayshore Highway crosses the Bayshore Cutoff at Tunnel 5, Sierra Point (c.1915)
Overview
Other name(s)Bay Shore Cut-Off
StatusRevenue service
OwnerPeninsula Corridor Joint Powers Board
LocaleSan Francisco and northern San Mateo counties
Termini
Stations7 (2 closed)
Service
TypeCommuter rail, heavy rail
SystemSP (Coast Line, Peninsula Commute; 1863-1992)
Caltrain and Union Pacific (1992-present)
History
CommencedOctober 26, 1904 (1904-10-26)
CompletedDecember 8, 1907 (1907-12-08)
Technical
Line length11.04 mi (17.77 km)
Number of tracks2 (4 in Brisbane after CTX)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Electrificationplanned, 25kV AC
Operating speed79 mph (127 km/h)
Highest elevation20.3 ft (6.2 m)
Tunnel 1
South portal of Tunnel 1 (2010)
South portal of Tunnel 1 (2010)
Overview
CrossesPotrero Hill
StartNorth portal: Mariposa St, between Pennsylvania & Indiana
37°45′50″N 122°23′34″W / 37.763992°N 122.392858°W / 37.763992; -122.392858
EndSouth portal: 22nd St (Pennsylvania & Iowa)
37°45′28″N 122°23′32″W / 37.757733°N 122.392337°W / 37.757733; -122.392337
Technical
Length1,817.3 feet (553.9 m)[1]
Tunnel 2
North portal of Tunnel 2 (2017)
North portal of Tunnel 2 (2017)
Overview
CrossesPotrero Hill
StartN: 23rd St (Pennsylvania & Indiana)
37°45′17″N 122°23′33″W / 37.754767°N 122.392490°W / 37.754767; -122.392490
EndS: 25th St (Connecticut & Pennsylvania)
37°45′06″N 122°23′35″W / 37.751800°N 122.392921°W / 37.751800; -122.392921
Technical
Length1,086.4 feet (331.1 m)[1]
Tunnel 3
South portal of Tunnel 3 (c.1907)
South portal of Tunnel 3 (c.1907)
Overview
CrossesHunters Point
StartN: Palou Ave (Dunshee & Phelps)
37°44′12″N 122°23′42″W / 37.736763°N 122.395005°W / 37.736763; -122.395005
EndS: Williams Ave (Diana & Reddy)
37°43′49″N 122°23′45″W / 37.730238°N 122.395885°W / 37.730238; -122.395885
Technical
Length2,364 feet (721 m)[1]
Tunnel 4
South portal of Tunnel 4 (2012)
South portal of Tunnel 4 (2012)
Overview
CrossesCandlestick Point
StartN: Salinas Ave (Gould & Carr)
37°43′16″N 122°23′52″W / 37.721194°N 122.397869°W / 37.721194; -122.397869
EndS: Blanken Ave (Bayshore & Tunnel)
37°42′43″N 122°24′04″W / 37.711814°N 122.401226°W / 37.711814; -122.401226
Technical
Length3,547 feet (1,081 m)[1]
Tunnel 5
North portal of Tunnel 5 (1908)
North portal of Tunnel 5 (1908)
Overview
CrossesSierra Point
StartN: between Van Waters & Rogers Rd and Bayshore Blvd
37°40′34″N 122°23′27″W / 37.675999°N 122.390933°W / 37.675999; -122.390933
EndS: between Bayshore Blvd & US 101 (now filled)
37°40′22″N 122°23′28″W / 37.672867°N 122.391118°W / 37.672867; -122.391118
Operation
Closed1956 (1956)
Technical
Length1,133.8 feet (345.6 m)[1]
Southern Pacific Railroad Bayshore Roundhouse
Roundhouse in 2009
Coordinates37°42′03″N 122°24′31″W / 37.70083°N 122.40861°W / 37.70083; -122.40861
Built1910; 114 years ago (1910)
NRHP reference No.10000113[2]
Added to NRHPMarch 26, 2010
Peninsula Commute

0.0
0.0
Third and Townsend Depot
San Francisco
Bayshore Cutoff
opened 1907
Tunnel 1
1.9
22nd Street
Valencia St
3.4
Tunnel 2
Tunnel 3
Bernal
4.6
4.1
Paul Avenue
Tunnel 4
San Miguel
6.9
5.2
Bayshore
Colma
9.2
Tunnel 5
abandoned
1956
Baden
12.2
8.6
Butler Road
closed
1983
Tanforan
9.3
South San Francisco
11.6
14.3
San Bruno
12.0
Lomita Park
closed
1963
13.7
17.0
Millbrae
15.2
Buri Buri
now Broadway
Easton
closed
1925
16.3
19.2
Oak Grove
now Burlingame
(Tram interchange
BER
1913–1918
)
17.9
21.1
San Mateo
18.9
Hayward Park
20.3
24.0
Beresford
now Hillsdale
21.9
25.1
Belmont
23.2
27.0
San Carlos
25.4
28.6
Redwood City
to Fremont/Oakland
via Dumbarton Cutoff
27.8
30.9
Fair Oaks
later Atherton
closed
2020
28.9
32.1
Menlo Park
30.1
34.0
Palo Alto
31.8
34.9
Mayfield
now California Avenue
Mayfield Cutoff
1908–1964
34.8
38.0
Castro
Los Altos
36
36.1
39.1
Mountain View
38.8
41.9
Murphys
now Sunnyvale
Monta Vista
41
44.3
47.4
Santa Clara
45.7
49.6
College Park
Congress Jct
45
Coast Line reroute
after 1935
San Jose Market
discontinued
1935
46.9
50.0
San Jose Diridon
Vasona Jct
48
Campbell
51
Los Gatos
51
to Monterey
via Del Monte
discontinued
1971

Legend
00.0
00.0
Distance from SF via Bayshore Cutoff
Distance from SF via Coast Route
(1907–1980)
(1863–1907)
completed routes
abandoned or removed routes
stations

The Bayshore Cutoff (originally the Southern Pacific Bay Shore Cut-Off)[1] is the rail line between San Francisco and San Bruno along the eastern shore (San Francisco Bay side) of the San Francisco Peninsula. It was completed by Southern Pacific (SP) in 1907 at a cost of $7 million, and included a series of five tunnels, four of which are still used daily by Caltrain, the successor to Southern Pacific's Peninsula Commute service. Fill excavated from the five tunnels was used to build the Visitacion or Bayshore Railyard, the main SP classification yard near the city of Brisbane.

The original alignment of the Coast Line completed in 1863 took it around the western side of San Bruno Mountain, through the cities of Colma and Daly City. Rail traffic along the original route was forced to use helper engines to traverse heavy grades and sharp curves along a indirect route nearly 13 miles (21 km) long. The Bayshore Cutoff reduced the distance to 10.5 miles (16.9 km) with a maximum grade of 0.3 percent.

Once the Bayshore Cutoff was completed, and mainline traffic was shifted to it, the former route was renamed the Ocean View line and relegated to branch status. It was used primarily to carry coffins to Colma before it was abandoned in the 1940s. In the late 1980s, BART purchased the right-of-way of the abandoned Ocean View line to use for the San Francisco International Airport extension south from Daly City.

One tunnel on the Bayshore Cutoff was abandoned when the line was rerouted east to accommodate the Bayshore Freeway in the 1950s. The rail yard was in operation until the 1970s, and the site is currently being considered for redevelopment for light industrial/retail use as part of the Brisbane Baylands development project.

History[edit]

The 1907 Bayshore Cutoff (red) saved distance and grade compared to the original 1863 routing (blue), later renamed the Ocean View line.

The original route between San Francisco and San Bruno was laid by the San Francisco and San Jose Railroad (SF&SJ), one of the companies that later was absorbed into the Southern Pacific (SP). From the station in San Francisco at Mariposa and 18th, tracks were laid generally bearing west-southwest through the Mission District close to the present-day route of San Jose Avenue.

Southern Pacific took over the Peninsula Corridor in 1870 from the SF&SJ and began operating the Peninsula Commute between San Francisco and San Jose. Surveys were conducted for an alternate route east of San Bruno Mountain as early as 1878[3] and in 1894, it was revealed that SP had secretly purchased a more direct route along the shoreline of San Francisco Bay through an agent, Alfred E. Davis, who had previously built a narrow-gauge railroad to Santa Cruz.[4] By 1900, the Bayshore Cutoff route, including five tunnels, had been designed and plans were announced to start work "within a few weeks".[3] The San Francisco Board of Supervisors attempted to compel SP to start using the Bayshore route by passing an ordinance in 1900 directing the Board of Public Works (BPW) to tear up the existing tracks. SP was granted an injunction to prevent that action, but BPW Commissioner Maguire planned to bring witnesses "to testify that the clanging of bells, shrieks of whistles, etc., interferes with the comfort and peace of the surrounding residents."[5]

SP announced firm plans to build the Bayshore Cutoff and double-track the line in late 1901.[6] President E. H. Harriman reiterated SP's plans to construct the Cutoff in mid-1902, predicting completion within the calendar year. Double-tracking from Burlingame south to San Jose was announced as well.[7] In conjunction with the Dumbarton Cutoff, the Bayshore Cutoff was designed to facilitate transcontinental rail service into San Francisco.[8] Instead of being a remote spur terminal, San Francisco would become "practically the same as a main line station" with the completion of the two new cutoffs, and transcontinental freight could then be loaded directly on trains without having to be ferried across the Bay.[9]

The San Jose-based Evening News touted the benefits of the Cutoff, saying the fifteen minute savings in travel time combined with a more temperate climate would naturally lead to increased population in San Jose: "The warmer, drier and more even climatic conditions make [San Jose] far preferable for residence to a place where the men feel the need of an overcoat in the evening of the warmest days, and where the ladies scarcely know what it is to dress in light clothing and walk out in the evening."[10] In 1903, the route of the Bayshore Cutoff was adjusted slightly; the original route called for tracks along Islais and Tulare streets, which due to their narrow width, would have closed those streets to any other traffic. Over a one-year period, Joseph B. Coryell acted as agent for SP to purchase properties bordering Islais Creek to allow the rerouting of the line.[11]

The Bayshore Railway company was founded as a subsidiary of the Southern Pacific to build the Bayshore Cutoff.[12] Construction started in 1904[13] and was completed in 1907[14] at a cost of $7 million[15] (equivalent to $167 million in 2023[16]), one of the most expensive rail lines constructed to date.[12]

Rail traffic to and from San Francisco shifted over to the new Bayshore Cutoff immediately and has remained along that route since its completion. Currently, Caltrain operates daily commuter train service through four of the tunnels originally constructed for the Bayshore Cutoff. The fifth tunnel at Sierra Point was bypassed with the completion of the Bayshore Freeway in the 1950s.

The prior route west of San Bruno Mountain was renamed the Ocean View line and relegated to branch status. Although the Ocean View line was abandoned in 1942,[17][18] the rails remained in place until the right-of-way was sold to the Bay Area Rapid Transit District and construction began on the SFO BART extension.[19][20]: 3.13-42  Other potential routes proposed for the BART extension included an aerial structure along El Camino Real and a rail line parallel to I-280/380.[21]

Visitacion Cove (Nov 1905), with trestle in place to receive fill

SP also completed a rail yard at Visitacion near the city of Brisbane. SP had previously purchased Visitacion Cove and partially filled it using earth excavated from the tunnels as well as mud dredged from the Bay.[22][23] The yard was used to assemble trains and a large roundhouse and shops were used for steam locomotive maintenance. After diesel locomotives replaced steam by 1958 (the last steam locomotive in SP's system was a Peninsula Commute engine, which ran on January 22, 1957),[24] the yard was used less frequently. SP consolidated freight operations at Oakland in 1964, and the Bayshore Railyard began to be dismantled in 1979.[24] The last day of work at the Bayshore shops was October 25, 1982;[25] the land was sold to Universal Paragon in 1989.[26]

Design[edit]

The line includes five tunnels, numbered in order from north to south, and a former railyard near Brisbane, California, the Visitacion or Bayshore Yard. The historic Bayshore Roundhouse, previously used to service SP's steam locomotives, still exists at the yard. The first four tunnels are within the city limits of San Francisco.[15]

The maximum grade of the completed Bayshore Cutoff is 15.8 feet per mile (2.99 m/km) (0.3% grade) compared to the 3% maximum grade of the older route.[15] The maximum elevation of the Bayshore Cutoff is 20.3 feet (6.2 m), while the prior route rose to 292 feet (89 m) above sea level. The total distance between San Francisco and San Bruno along the Cutoff is 11.04 miles (17.77 km), saving 2.65 miles (4.26 km) over the original route west of San Bruno Mountain.[15] The original 1900 design called for an aggregate length of the two tunnels under Potrero Hill and Sierra Point of 1,800 feet (550 m).[3]

After completion, travel time from San Jose to San Francisco was cut from two hours to ninety minutes (for local trains) and seventy minutes (for limited-stop trains). The Evening News breathlessly advertised "the annihilation of seventeen minutes in a schedule" in an article covering the opening of the Cutoff.[27]

Although the Bayshore Cutoff is double-tracked,[28] the right-of-way outside the tunnels is sized to accommodate quad tracks.[26] Quad tracks were added in Brisbane as part of the Caltrain Express project from 2004 to 2006.

Mliu92/sandbox/Bayshore Cutoff is located in San Francisco
Bayshore Railyard
Bayshore Railyard
Tunnel 5
Tunnel 5
Tunnel 4
Tunnel 4
Tunnel 3
Tunnel 3
Tunnel 2
Tunnel 2
Tunnel 1
Tunnel 1
Bayshore Cutoff Tunnels & Yard

Construction[edit]

Initial bids on construction costs ranged between $2 and $2.5 million.[13] Preliminary work began in April 1904,[29] and actual construction started on October 26 of that year.[30] An earthquake in late November 1904 was at first mistaken for blasting being done for the Cutoff.[31] Work on the first tunnel (which was later designated Tunnel No. 5) at Sierra Point began on April 18, 1905, and at the time it was predicted that revenue service would begin on December 31, 1906.[32] A week and a half later, a steam shovel had excavated 150 feet (46 m) (starting from the south portal) and work had begun on the second tunnel (later designated Tunnel No. 4), which had reached a length of 200 feet (61 m).[33] After the Lucin Cutoff was completed, workers on that job moved to the Bayshore project, and orders were placed for forty iron arches, each spanning 30 ft (9.1 m), to be used in tunnel construction.[34]

By May 1905, good progress was being made, as workers excavating the tunnel had found "nothing harder than sand and earth", but they were forced to wear rubber clothes due to the damp conditions.[35] Two shifts of work were started in June, and the stone blocks to be used in the portals had arrived at Tunnel 5.[36] By July, work on the final tunnel (later designated Tunnel No. 3) had started, and SP General Manager E.E. Calvin confidently predicted all tunnels would be completed in 1906.[28] Heavy rain during February 1906 damaged the roadbed between South San Francisco and San Bruno when the final stages of construction were about to commence.[37]

Work was being performed in two shifts when the 1906 San Francisco earthquake struck in April. Workers in Tunnel 3 (below the orphanage) were terrified by the shaking, which extinguished the lamps they were using, but no one was injured and the tunnel was not damaged.[38] After the earthquake, construction continued. Earthquake survivors were unnerved by blasting for the tunnels, which they thought were aftershocks.[14] Some of the areas for the Bayshore Cutoff route south of China Basin were filled with rubble from the earthquake, allowing more rapid progress than planned.[39] SP officials announced in August 1906 the estimated completion date for the Bayshore Cutoff would be January 24, 1907. Once the Cutoff was in place, they stated that more frequent service would be offered for commuters, with headways of 30 minutes and total travel time to San Jose estimated at one hour.[40]

By July 1907, four bridges still needed to be completed for the Cutoff, touted to be "one of the fastest pieces of railroad in the United States" once it was completed.[41] The steel girders were delayed in transit and the completion date of the Cutoff was delayed from October to November 1907.[42] A final carload of steel was rushed from Ogden to complete the Fifth Avenue crossing, and the first planned passenger trains to use the Cutoff would be for fans from San Francisco traveling to Stanford to watch a football game.[43] The new line officially opened on December 8, 1907.[27]

Tunnels[edit]

Average progress on the tunnels was 8 feet per day (0.028 m/ks).[15] The aggregate length of the five tunnels is 9,947 feet (3,032 m) as completed[15] (10,180 feet (3,100 m) as designed),[44] which is one-fifth of the entire 9.81-mile (15.79 km) length of the Bayshore Cutoff.[26] Each tunnel shares the same cross-section design, being a semicircular arch 30 feet (9.1 m) wide to accommodate two tracks spaced 13 feet (4.0 m) apart (centerline to centerline). Overall height in the center of the tunnel is 25 feet (7.6 m), with clearance of 22 feet (6.7 m) above the top of the rail at each track centerline. The tracks are elevated 1 foot 8 inches (0.51 m) above the tunnel floor by ballast and ties.[44]

Tunnel 5 was built using cut-and-cover methods, but the other four were built by sinking pilot drifts approximately 8 by 7 feet (2.4 by 2.1 m) in cross-section at the bottom corners of the tunnel. After these first two drifts were completed, another two drifts on top of the first drifts were bored, then a drift at the apex of the tunnel, followed by excavation of the remaining space between the top and side drifts. Once the drifts were complete, false timbers were placed and the arch was built of brick, resting on concrete side walls.[1]

Tunnels 1 and 2 bracket the present-day 22nd Street station. Tunnel 1 is just north of the station, and Tunnel 2 is south. Both tunnels are cut through Potrero Hill. Tunnel 2 is the only one of the five tunnels built with twin bores to accommodate four tracks, although the western bore is currently closed. The western bore was built because a high concrete retaining wall was needed to support a city street running alongside that second tunnel.[1] Tunnel Top Park, at 1100 Pennsylvania Avenue, is within the Caltrain-owned right-of-way. These two tunnels were bored through mostly serpentinite rock with clay seams.[1]

The Western Pacific Railroad (WP) also built a tunnel through Potrero Hill at nearly the same time;[45] support timbers within the Western Pacific tunnel caught fire in 1962, leading to its collapse and subsequent fill. The area on top of the WP tunnel remained undeveloped until the 1990s.[46]

North portal of Tunnel 5 (2018)

Tunnel 3 traverses the Hunters Point neighborhood. It was built under the St. Joseph's orphan asylum. The tracks are 175 feet (53 m) below the ground's surface.[15] Tunnel 3 is bored through wet sand and hard silicated formations.[1]

Tunnel 4 crosses Candlestick Point. The former Schlage factory and headquarters, constructed in 1926, are located just west of the southern portal of Tunnel 4. In 1907, it was noted that Tunnel 4 had been bored through very wet ground and partly through shale.[1] The earthquake of April 1906 caused a spring to start leaking into Tunnel 4, which went unnoticed until several months after the seismic event, when the reinforced concrete of the completed tunnel began to bulge, eventually causing water to leak into the tunnel. The spring was not capped until 1911.[47]

Tunnel 5 crosses Sierra Point and was bored through hard sandstone.[1] Tunnel 5 was abandoned in 1956 when the old Bayshore Highway (which is now the present-day Bayshore Boulevard in Brisbane and South San Francisco) was rerouted and expanded into the six-lane divided Bayshore Freeway.[48] The route for the freeway was moved to the east along a new berm constructed on fill between Candlestick Point and Sierra Point,[49] which also pushed the rail line east, eliminating the need for the tunnel. The southern portal would emerge between Bayshore Boulevard and the Bayshore Freeway, but it has since been filled in. The northern portal still exists, but access is restricted by a padlocked fence next to a parking lot just off Bayshore Boulevard.

Bayshore Railyard[edit]

Aerial view of area (facing approximately southwest) surrounding the former Bayshore Railyard (2006).
  •  Cutoff 
  •  Railyard 
  •  Roundhouse 
Schematic plan of Bayshore Railyard (from 1907)
Other prominent landmarks include San Bruno Mountain (rising in the background), the city of Brisbane in its northeastern edge (left), and a quarry on the north edge. The Cow Palace is at the center right side of the photo, and U.S. 101 cuts diagonally from the center left to the bottom center. When originally completed in 1907, the Bayshore Cutoff rail line was on the western shore of San Francisco Bay; the area east of the line was subsequently filled as the municipal landfill for the City and County of San Francisco until the 1950s.

Fill taken from tunnel excavation and cuts was used to build a new railyard at Visitacion. One of the cuts, at Visitacion Point, was 95 feet (29 m) deep and removed 750,000 cubic yards (570,000 m3) of material.[26] SP purchased Visitacon Cove and constructed 2.5 miles (4.0 km) of trestles to dump fill into San Francisco Bay, reclaiming 156 acres (63 ha) of land in total.[15] The Bayshore Railyard contained approximately 50–65 miles (80–105 km) of track, in a triangular area roughly bounded by the Bayshore Cutoff main line (on the east) and the Bayshore Highway (on the west, now Bayshore Boulevard). It extended 8,400 feet (2,600 m) in length, measured south from the southern portal of Tunnel 4, and 1,800 feet (550 m) wide, measured east from the Roundhouse, near the apex of the triangle.[22][23]

The design of the Bayshore Railyard had thirty-eight tracks in the main freight space; seven tracks on both the north and south ends each had a capacity of fifty cars. The north end of the yard also had fourteen storage tracks (total capacity of 472 cars) and eighteen classification tracks.[22] SP consolidated its freight and maintenance operations at the Bayshore Yard; maintenance had previously been performed at two locations: 16th and Harrison, and Mariposa.[50] The yard hump was the second hump constructed on the West Coast[26] (after the classification yard at Roseville).[1]

Steam locomotive maintenance would start in the Roundhouse. Once the locomotive left the Roundhouse, it would move to the Transfer Pit (northwest of the Roundhouse), then be moved into the Erecting and Machine Shops, where a gantry crane would pick up the boiler and put it on a railcar to move it 300 feet (91 m) south to the Tank and Boiler Shop for refurbishment.[26] At the height of operations between 1911 and 1958, more than 3,000 were employed at the Railyard and shops.[25] The Railyard was handling 42,000 cars per month in 1921, and had 1,196 employees earning a monthly average of US$164.31 (equivalent to $2,900 in 2023).[24] As SP's most heavily traveled segment, the Railyard handled 22 million gross tons per mile of freight in the 1920s and 46.5 million gross tons per mile during World War II.[24]

One scene for the film Harold and Maude was filmed at the Bayshore Railyard; the large Erecting and Machine Shops (or Backshops) building was used as the studio of Glaucus, the artist who is carving a nude of Maude in ice. That building was demolished in the mid-1980s.[51][52]

The Bayshore Railyard site was acquired by Tuntex (now Universal Paragon) in 1989. Universal Paragon has proposed redeveloping the area as the Brisbane Baylands development. As of 2013, the only buildings left from the Railyard are the Roundhouse (built c.1910, abandoned), the Tank and Boiler Shop (built c.1920, leased to Lazzari Fuel in 1963 and used as a charcoal warehouse), and the Visitacion Ice Manufacturing Plant (built 1924 for Pacific Fruit Express, currently leased to Machinery and Equipment, Inc.).[26][53]

Bayshore Roundhouse[edit]

Bayshore Roundhouse (2012)

The Bayshore Roundhouse was completed in 1910 and still stands, although it was damaged in an October 2001 fire which destroyed approximately half the roof.[54] Construction on the Roundhouse started in 1908, shortly after the Bayshore Cutoff was completed, and it was one of the first buildings at the new Bayshore Railyard.[24]

The Roundhouse encompasses an arc of 108 degrees, and has an inner radius of 125 feet (38 m) and an outer radius of 212 feet (65 m).[24] It has forty stalls, and an on-site powerhouse, north of the Roundhouse, provided steam for locomotive use, burning coal from a bunker 600 feet (180 m) long.[22] Seventeen of the stalls (numbered #24 to #40, clockwise) were inside the building and covered.[25][24] Stalls #1 to #23 were outside whisker tracks, although construction plans suggest the roundhouse was originally designed to enclose these as well.[24] The wall adjacent to stall #40, on the eastern side of the building, contains four sets of windows, and the outer circumference of the building has two sets of windows for each stall. There is one fire wall (between stalls #32 and #33) without windows, and the wall adjacent to stall #24 does not have windows, since it was originally intended to serve as a second interior fire wall.[24]

Aerial view, facing south, of Bayshore Roundhouse (note burned roof over stalls #24–32) and Tank and Boiler Shop (at lower right), in 2006

The turntable was enlarged to 110 feet (34 m) in 1941 using steel salvaged from the Pajaro River bridge; with the enlargement, the Roundhouse was capable of handling SP's largest steam locomotives.[25] The fire in 2001 destroyed the roof covering stalls #24 through #32.[24] Today, it is the last standing brick roundhouse in California,[25] and it was added to the National Register of Historic Places in 2010.[55]

Other structures[edit]

The Tank and Boiler Shops ceased operation with the end of steam locomotives in the 1950s, and was leased to the Lazzari Fuel Company in 1963, who use it today to store charcoal.[26]

The Visitacion Ice Manufacturing Plant, at the south end of the Bayshore Railyard, was completed in 1924. It was capable of freezing 90 short tons (82 t) of ice per day, and could store 2,300 short tons (2,100 t). It made ice between 1924 and 1955 for the Pacific Fruit Express refrigerated cars. The building was sold to the Market Street Van & Storage Company in 1962.[26]

Stations[edit]

From north to south:

References[edit]

  1. ^ a b c d e f g h i j k l m "The Bay Shore and Dumbarton Cut-Offs of the Southern Pacific". The Railroad Gazette. XLII (11): 328–331. 15 March 1907.
  2. ^ "National Register Information System – (#10000113)". National Register of Historic Places. National Park Service. November 2, 2013. Retrieved 31 March 2017.
  3. ^ a b c "Two Tracks to San Jose". The Evening News. San Jose. 4 May 1900. Retrieved 11 July 2016.
  4. ^ "Buys a way out". San Francisco Call. Vol. 75, no. 170. 19 May 1894. Retrieved 8 July 2016.
  5. ^ "Court to pass on nuisance of Mission tracks". San Francisco Call. Vol. 87, no. 86. 25 August 1900. Retrieved 8 July 2016.
  6. ^ "Double Track Of Coast Line". The Deseret News. 24 December 1901. Retrieved 12 July 2016.
  7. ^ "Rush Double Track To The Garden City". The Evening News. San Jose. 14 May 1902. Retrieved 11 July 2016.
  8. ^ "New System Will Benefit City". San Francisco Call. Vol. 100, no. 38. 8 July 1906. Retrieved 8 July 2016.
  9. ^ "Railway Bridge Across Narrows at Dumbarton Point". The Evening News. San Jose. 8 September 1906. Retrieved 11 July 2016.
  10. ^ "Bay Shore Cutoff Favored by Local Business Men". The Evening News. San Jose. 12 March 1903. Retrieved 11 July 2016.
  11. ^ "New Course Desired for Bay Shore Cut Off". The Evening News. San Jose. 7 August 1903. Retrieved 11 July 2016.
  12. ^ a b Dunscomb, Guy L. (1963). A century of Southern Pacific steam locomotives, 1862–1962. Modesto, California: Modesto Printing Company. p. 366. LCCN 63-14308. Retrieved 12 July 2016.
  13. ^ a b "Bay Shore Cut-off Line to be Rushed". Los Angeles Herald. 4 March 1904. Retrieved 26 March 2018.
  14. ^ a b Douglas, Don (2011). "Southern Pacific's Bayshore Yard". The Ferroequinologist. Retrieved 17 April 2017.
  15. ^ a b c d e f g h "Guests inspect the new Bay Shore Cutoff". San Francisco Call. Vol. 103, no. 8. 8 December 1907. Retrieved 8 July 2016.
  16. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  17. ^ Bevk, Alex (29 May 2013). "The Lost Railroad Tracks of the Mission and Noe Valley". Curbed San Francisco. Retrieved 24 April 2018.
  18. ^ Brandi, Richard; LaBounty, Woody (January 2010). "San Francisco's Ocean View, Merced Heights, and Ingleside (OMI) Neighborhoods, 1862 - 1959" (PDF). Western Neighborhoods Project. Retrieved 24 April 2018.
  19. ^ Fredericks, Darold (3 June 2013). "The History of BART on the Peninsula". San Mateo Daily Journal. Retrieved 17 April 2017.
  20. ^ BART-San Francisco Airport Extension: Final Environmental Impact Report/Final Environmental Impact Statement (Report). Vol. I. Bay Area Rapid Transit District. June 1996. Retrieved 8 January 2018.
  21. ^ California Fair Political Practices Commission (31 March 1988). "Application of the conflict of interest provisions of the Political Reform Act" (PDF). Letter to Mr. Robert S. Allen. Retrieved 8 January 2018.
  22. ^ a b c d "Railroad Rushes Work at Visitacion Bay". San Francisco Call. Vol. 101, no. 45. 14 January 1907. Retrieved 26 March 2018.
  23. ^ a b "Rushing Work at Dumbarton". The Evening News. San Jose. 16 January 1907. Retrieved 11 July 2016.
  24. ^ a b c d e f g h i j Brandi, Richard (9 November 2009). Southern Pacific Railroad Bayshore Roundhouse (PDF) (Report). Office of Historic Preservation, California State Parks. Retrieved 7 March 2018.
  25. ^ a b c d e "Roundhouse" (PDF). San Francisco Trains. Retrieved 11 July 2016.
  26. ^ a b c d e f g h i "4: Environmental Setting, Impacts, and Mitigation Measures; Section 4.D: Cultural Resources". Brisbane Baylands Draft Environmental Impact Report (PDF) (Report). City of Brisbane. June 2013. Retrieved 6 April 2018.
  27. ^ a b "Bay Shore Cut-Off Is Now Open". The Evening News. San Jose. 9 December 1907. Retrieved 11 July 2016.
  28. ^ a b "Bay Shore Cut-off is Nearing Completion". Los Angeles Herald. Associated Press. 19 July 1905. Retrieved 26 March 2018.
  29. ^ "Will build Bay Shore Cut-off". Los Angeles Herald. 11 April 1904. Retrieved 26 March 2018.
  30. ^ "Work begins on Bay Shore Cut-off". Los Angeles Herald. Associated Press. 27 October 1904. Retrieved 26 March 2018.
  31. ^ "Earthquake Shock About The Bay Not Felt In San Jose". The Evening News. San Jose. 1 December 1904. Retrieved 11 July 2016.
  32. ^ "Work is begun on big tunnel". San Francisco Call. Vol. 97, no. 141. 19 April 1905. Retrieved 8 July 2016.
  33. ^ "Rapid work on tunnel". San Francisco Call. Vol. 97, no. 151. 28 April 1905. Retrieved 26 March 2018.
  34. ^ "Rushing work on the tunnels". San Francisco Call. Vol. 97, no. 159. 6 May 1905. Retrieved 26 March 2018.
  35. ^ "Rushing work on the tunnel". San Francisco Call. Vol. 97, no. 166. 13 May 1905. Retrieved 8 July 2016.
  36. ^ "Work being rushed on the big tunnels". San Francisco Call. Vol. 98, no. 17. 17 June 1905. Retrieved 26 March 2018.
  37. ^ "Rain Damages Roadbed". San Francisco Call. Vol. 99, no. 84. 22 February 1906. Retrieved 8 July 2016.
  38. ^ "Quake terrifies men in railroad cut-off tunnel". San Francisco Call. Vol. 99, no. 153. 2 May 1906. Retrieved 3 April 2018.
  39. ^ Fredricks, Darold (17 December 2012). "Southern Pacific Railroad". San Mateo Daily Journal. Retrieved 3 April 2018.
  40. ^ "Bay Shore Cut-Off to be completed in January". Sacramento Union. No. 181. 21 August 1906. Retrieved 8 July 2016.
  41. ^ "To Spend Millions for Cut Off". The Evening News. San Jose. 23 July 1907. Retrieved 11 July 2016.
  42. ^ "Work On Cut-off Is Delayed". The Evening News. San Jose. 9 October 1907. Retrieved 11 July 2016.
  43. ^ "Cut-Off to Open Next Saturday". The Evening News. San Jose. 6 November 1907. Retrieved 11 July 2016.
  44. ^ a b "Bay Shore Cut-Off of the Southern Pacific". The Railroad Gazette. XXXVII (23): 566. 18 November 1904.
  45. ^ "Terminal site of new road". San Francisco Call. Vol. 99, no. 32. 1 January 1906. Retrieved 4 April 2018.
  46. ^ Carlsson, Chris. "Potrero Commons 18th-Wisconson". FoundSF. Retrieved 4 April 2018.
  47. ^ "Southern Pacific Company Has Conquered Water Spring". Red Bluff News. No. 79. 9 June 1911. Retrieved 8 July 2016.
  48. ^ Garrido, Angel (2012). "Modeling S.P. Tunnel Structures". Modeling the SP. Retrieved 11 July 2016.
  49. ^ Booker, B.W. (March–April 1956). "Freeways In District IV" (PDF). California Highways and Public Works. 35 (3–4): 7. Retrieved 11 July 2016. The over water fill section between the completed freeway at Third Street in San Francisco southerly to Candlestick Point and across the open water of an arm of San Francisco Bay to Sierra Point and connecting with the completed freeway near Butler Road, in South San Francisco is the only portion of the freeway remaining to be completed between the Bay Bridge and just north of Redwood City.
  50. ^ "New Bay Shore Yards of the Southern Pacific at San Francisco". Railroad Gazette. XLII (1): 12–13. 4 January 1907. Retrieved 18 May 2018.
  51. ^ CitySleuth (8 November 2015). "Harold and Maude - Glaucus's Studio". Reel SF. Retrieved 6 April 2018.
  52. ^ Meretzky, Steve. "Glaucus' studio". boffo. Retrieved 6 April 2018.
  53. ^ "3: Project Description". Brisbane Baylands Draft Environmental Impact Report (PDF) (Report). City of Brisbane. June 2013. Retrieved 6 April 2018.
  54. ^ Lipps, Jeremy (7 November 2013). "#CALTRAIN150: Rise and Fall of the Bayshore Roundhouse". Peninsula Moves. Retrieved 11 July 2016.
  55. ^ "Weekly list of actions taken on properties: 3/22/10 through 3/26/10". National Park Service. 2 April 2010. Retrieved 18 May 2018.

External links[edit]