Talk:Vizag back-to-back HVDC converter station

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

synchronizing grids[edit]

Sometimes the excess power fed to the southern grid by this HVDC link is flowing back to Western region through the 765 KV AC lines between Southern grid and the Western grid which is not desired. — Preceding unsigned comment added by 106.51.21.52 (talk) 06:38, 21 April 2016 (UTC)[reply]