Line 3 (Madurai Metro)

From Wikipedia, the free encyclopedia

Purple Line (Line 3)
Overview
StatusProposed
Termini
  • Manalur
  • Chekanurani
Stations19
Service
TypeRapid transit
SystemMadurai Metro
Operator(s)CMRL
History
Planned openingDecember 2027
Technical
Line length23 km (14 mi)
Number of tracks2
Operating speed60 km/h (37 mph)
Route map

Manalur
Silaiman
Puliyankulam
Velammal College
Viraganoor
Teppakulam
Munichalai
Keelavasal
Therkuvasal Line 2
Madurai Junction Madurai Junction railway station
Arasaradi
Arapalayam
Bethaniapuram
Kalavasal
HMS Colony
Achampattu
Nagamalai Pudukkottai
Vadapalanji
Chekanurani

The Purple Line (Line 3) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Manalur to Chekanurani. The line consists of 19 stations. [1][2]

Stations[edit]

The stations proposed in the Phase 2 of Madurai Metro in the Purple Line (Line 3) are as follows:- [3][4]

Purple Line (Line 3)
S.No Station Name Interchange connection Places Connected Layout Opened Depot Connection Depot Layout
English Tamil
1 Manalur மணலூர் None None (TBC) Proposed Phase 3 Manalur Depot None
2 Silaiman சிலைமான் None None (TBC) Proposed Phase 3 None None
3 Puliyankulam புளியங்குளம் None None (TBC) Proposed Phase 3 None None
4 Velammal College வேலம்மாள் கல்லூரி None None (TBC) Proposed Phase 3 None None
5 Viraganoor விரகனூர் None None (TBC) Proposed Phase 3 None None
6 Teppakulam தெப்பக்குளம் None None (TBC) Proposed Phase 3 None None
7 Munichalai முனிச்சாலை None None (TBC) Proposed Phase 3 None None
8 Keelavasal கீழவாசல் None None (TBC) Proposed Phase 3 None None
9 Therkuvasal தெற்குவாசல் None Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal, Line 2 Underground Proposed Phase 3 None None
10 Madurai Junction மதுரை சந்திப்பு Mainline rail interchange Madurai Junction, Bus interchange Periyar Bus Terminus Meenakshi Amman Temple West Tower, Line 1, Line 2 Underground Proposed Phase 3 None None
11 Arasaradi அரசரடி None None (TBC) Proposed Phase 3 None None
12 Arapalayam ஆரப்பாளையம் None None (TBC) Proposed Phase 3 None None
13 Bethaniapuram பெத்தானியாபுரம் None None (TBC) Proposed Phase 3 None None
14 Kalavasal கலைவாசல் None None (TBC) Proposed Phase 3 None None
15 HMS Colony எச்.எம்.எஸ் காலனி None None (TBC) Proposed Phase 3 None None
16 Achampattu அச்சம்பட்டு None None (TBC) Proposed Phase 3 None None
17 Nagamalai Pudukkottai நாகமலை புதுக்கோட்டை None None (TBC) Proposed Phase 3 None None
18 Vadapalanji வடபழஞ்சி None None (TBC) Proposed Phase 3 None None
19 Chekanurani செக்கனுராணி None None (TBC) Proposed Phase 3 None None

See also[edit]

References[edit]

  1. ^ "Instagram". www.instagram.com. Retrieved 29 March 2024.
  2. ^ Balasubramanian, Harini (8 April 2023). "Madurai Metro to link international airport under Phase 2". Housing News. Retrieved 29 March 2024.
  3. ^ "Madurai metro to link airport in phase II; 5 km to be underground". Retrieved 7 April 2023.
  4. ^ Staff, T. N. M. (20 February 2023). "Madurai metro: CMRL submits feasibility report, three things to know". The News Minute. Retrieved 29 March 2024.