User:Blaixx/sandbox

From Wikipedia, the free encyclopedia

REM test[edit]

  • REM}}
  • REM|REM}}
  • REM|rem}}
  • REM|A1}}
  • REM|a2}}
  • REM|A}}

Inaugural CPL match[edit]

Details[edit]

Forge FC1–1York 9 FC
  • Thomas 78'
Report
Forge
York 9
GK 1 Triston Henry
DF 2 Jonathan Grant downward-facing red arrow 13'
MF 3 Elimane Oumar Cissé
DF 4 Dominic Samuel
DF 6 Kwame Awuah
MF 8 Giuliano Frano Yellow card 68'
MF 10 Kyle Bekker (c)
FW 11 Chris Nanco downward-facing red arrow 55'
MF 13 Alexander Achinioti Jönsson downward-facing red arrow 77'
FW 14 Emery Welshman
MF 19 Tristan Borges
Substitutions:
DF 21 Bertrand Owundi upward-facing green arrow 13'
FW 17 Kadell Thomas upward-facing green arrow 55'
FW 9 Marcel Zajac upward-facing green arrow 77'
Manager:
Bobby Smyrniotis
DF 2 Daniel Gogarty
DF 5 Justin Springer
MF 8 Joseph Di Chiara downward-facing red arrow 87'
MF 10 Manny Aparicio (c) Yellow card 59' Yellow-red card 90+5'
FW 12 Simon Adjei downward-facing red arrow 80'
DF 13 Luca Gasparotto
FW 17 Cyrus Rollocks
MF 18 Ryan Telfer
MF 19 Kyle Porter
MF 23 Wataru Murofushi downward-facing red arrow 67'
GK 29 Nathan Ingham
Substitutions:
FW 7 Austin Ricci upward-facing green arrow 67'
FW 22 Rodrigo Gattas upward-facing green arrow 80'
DF 20 Diyaeddine Abzi upward-facing green arrow 87'
Manager:
Jim Brennan

Man of the Match:
TBD

Assistant referees:
Philippe Briere, Peter Pendli
Fourth official:
Yusri Rudolf

Match rules

  • 90 minutes
  • Maximum of seven named substitutes
  • Maximum of three substitutions

2041 RTP[edit]

Projects completed 2008–2017
Project # Project Name Termini Termini
1 Kitchener line extension Georgetown GO Kitchener GO
2 Barrie line extension Barrie South GO Allandale Waterfront GO
3 Lakeshore West line extension Aldershot GO West Harbour GO
4 Mississauga Transitway Winston Churchill Renforth
5 Highway 7 Rapidway East Richmond Hill Centre Terminal Unionville GO
6 Davis Drive Rapidway Newmarket Bus Terminal Newmarket GO
7 Union Pearson Express Union Station Toronto Pearson International Airport
8 Richmond Hill line extension Richmond Hill GO Gormley GO
9 Toronto–York Spadina subway extension Sheppard West Vaughan
Projects in delivery
Project # Project Name Termini Termini
10 Eglinton Crosstown LRT Mount Dennis Kennedy
11 Sheppard East LRT Don Mills Morningside Ave.
12 Finch West LRT Humber College Finch
13 Scarborough Subway extension Kennedy Scarborough Centre
14 B-Line McMaster University Eastgate Square
15 Highway 7 West Rapidway Helen St. Richmond Hill Centre
16 Hurontario LRT Port Credit GO Steeles Ave.
17 Yonge Street Rapidway (North) Mulock Dr. Davis Dr.
18 Yonge Street Rapidway (South) Richmond Hill Centre 19th Ave.
19 Richmond Hill line extension Gormley GO Bloomington GO
20 Lakeshore East Bowmanville extension Oshawa GO Bowmanville GO
21 Lakeshore West Niagara extension West Harbour GO Confederation GO
22 Confederation GO Niagara Falls
23 Lakeshore West two-way, all-day Aldershot GO Hamilton GO
24 Barrie two-way, all-day Aurora GO Allandale Waterfront GO
25 Kitchener two-way, all-day Mount Pleasant GO Kitchener
26 Stouffville two-way, all-day Unionville GO Mount Joy GO
27 Kitchener 15-min Union Station Mount Pleasant GO
28 Barrie 15-min Aurora GO
29 Stouffville 15-min Unionville GO
30 Lakeshore West 15-min Aldershot GO
31 Lakeshore East 15-min Oshawa GO
Projects in development
Project # Project Name Termini Termini
32 Dundas West priority bus
33 Dundas Street BRT
34 Brampton Queen St. BRT
35 Eglinton West LRT
36 Highway 7 West Rapidway extension
37 Waterfront West LRT
38 Waterfront East LRT
39 Relief Line subway
40 Yonge North subway extension
41 Yonge BRT extension
42 Eglinton East LRT
43 Highway 7 East Rapidway extension
44 Durham–Scarborough BRT

List of projects[edit]