Talk:Miravalles Solar Park

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

The total peek power provided 1.0105 MW, even if mathematically correct, hasn't any engineering sense. As far as I know it's the result of (4300 panel × 235 Wp/panel) / 1000000 = 1.0105 MW, but 2 digit can better describe the total power of the plant.

So I propose to change 1.0105 MW with 1.01 MWp (adding also p that means peek).

--Palladipeloarancione (talk) 03:59, 29 May 2021 (UTC)[reply]