Talk:Frank & Seder Building (Detroit)

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Further development[edit]

Not sure how much detail to go into regarding the various Frank & Sader building occupancy & renovations, so I'll list here.

In 1999, credit card processing firm Cardworks assumed one floor of the Pittsburgh Smithfield F&S building, followed by a second floor, with an option on a third.[1] In July 2012, the six-story store was under consideration for extensive remodeling, or replacement by a high-rise tower development.[2]
  1. ^ Lindeman, Teresa F. (March 19, 2012). "Card manager to add 200 Downtown jobs". Pittsburgh Post-Gazette.
  2. ^ Rosenblum, Charles (July 18, 2012). "Weighing two redevelopment options for the same parcel of Downtown land". Pittsburgh City Paper.

--Lexein (talk) 14:40, 3 August 2012 (UTC)[reply]

Dead sources[edit]

  • [1][2] Van Atta, Robert B. (January 30, 2005 (1983, 1994)). "Vignettes: Region was (somewhat) civilized by 1794". Pittsburgh Tribune-Review.

--Lexein (talk) 04:20, 18 November 2012 (UTC)[reply]