Northeast Corridor Rapid Transit Project

Route map:
From Wikipedia, the free encyclopedia

Northeast Corridor
Aventura
FIU Biscayne Bay Campus
North Miami
Little Haiti
Design District
Wynwood
I-395.svg
I-395
Dolphin Expressway
MiamiCentral enlarge…
Tri-Rail

Disabled access All stations are accessible

The Northeast Corridor Rapid Transit Project is a planned commuter rail service in Miami-Dade County, Florida. The line is planned to extend from MiamiCentral to the Aventura station along the existing Florida East Coast Railway (FEC) tracks. It will have seven stations for the service in Miami-Dade, with both of the terminal stations having access to Brightline.[1][2] Service could begin as soon as 2028.[3] Tri-Rail is a potential operator of the service.[4] Prior to Brightline, a similar project was known as the Coastal Link in the 2010s with Tri-Rail as the prospective operator. Either project would have service continuing north into Broward and Palm Beach County, with the respective segments built under those jurisdictions.

History[edit]

In 2020, it was revealed that Brightline was planning a commuter rail service to complement their existing intercity service. Referred to as the Northeast Corridor,[5] trains would run between MiamiCentral and Aventura with five stations between.[5] Brightline and the Miami-Dade County Commission agreed to access fees in November 2020.[6] The estimated cost for full buildout of the line was $325 million in 2021.[5] Operations were expected to start as early as 2024.[7] By 2023, station locations had been identified and service frequencies for trains were expected to be every 30 to 60 minutes.[8] The price of the project had increased to $588,663,000.[9]

Map[edit]

Map

See also[edit]

References[edit]

  1. ^ "Miami-Date County Department of Transportation and Public Works (DTPW) Northeast Corridor Rapid Transit Project Fact Sheet" (PDF). miamidade.gov. Archived (PDF) from the original on July 12, 2023.
  2. ^ "Northeast Corridor". www.miamidade.gov. Retrieved February 2, 2023.
  3. ^ Plasencia, Amanda (October 11, 2023). "A closer look at the Northeast Corridor Rapid Transit Project, Miami-Dade's newest commuter train". NBC Miami. Retrieved November 8, 2023.
  4. ^ "Tri-Rail Coastal Link South Florida East Coast Corridor (SFECC) Transit Analysis Study". tri-railcoastallinkstudy.com. Retrieved March 9, 2023.
  5. ^ a b c Scheckner, Jesse (March 23, 2021). "After $345 million buildout, Brightline to run new intercity rail". Miami Today. Retrieved April 6, 2021.
  6. ^ "Brightline, Miami-Dade OK access fee for new commuter-rail system". Progressive Railroading. November 18, 2020. Retrieved November 21, 2020.
  7. ^ Scheckner, Jesse (April 6, 2021). "Miami-Dade seeks federal funding for Northeast commuter rail line". Miami Today. Retrieved April 11, 2021.
  8. ^ Hanks, Douglas (February 23, 2023). "A commuter train along U.S. 1 in Miami? County unveils plan without El Portal station". Miami Herald. Retrieved June 1, 2023.
  9. ^ "Miami-Aventura rail route cost rises quarter billion". Miami Today. September 26, 2023. Retrieved November 8, 2023.

External links[edit]

KML is not from Wikidata