Bommasandra metro station

Coordinates: 12°49′10″N 77°41′18″E / 12.81933°N 77.68834°E / 12.81933; 77.68834
From Wikipedia, the free encyclopedia
Delta Electronics - Bommasandra
Namma Metro station
Final stages of this metro station as of April 2024
General information
LocationBommasandra Industrial Area, Bommasandra, Karnataka 560099
Coordinates12°49′10″N 77°41′18″E / 12.81933°N 77.68834°E / 12.81933; 77.68834
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Train Terminates Here
Platform numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Heelalige railway station
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeTBC
History
OpeningNovember 2024; 5 months' time (November 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Hebbagodi Yellow Line
(Operational around November 2024)
Terminus
Location
Map

Delta Electronics - Bommasandra [1] is the upcoming elevated southern-east terminal metro station on the Yellow Line of the Namma Metro serving the Bommasandra neighbourhood with its Industrial Area and Heelalige railway station connected in this area. The station has been named after the popular Electronics Company located close to it.

To commemorate its 20th anniversary in India, Delta Electronics India Pvt Ltd (Delta India) announced a partnership with Bangalore Metro Rail Corporation Limited (BMRCL). The two entities have signed a Memorandum of Understanding (MoU) for the naming rights of the Bommasandra Metro Station on the yellow line of RV Road to Bommasandra Line (Reach-5) as part of Phase-II of the Bangalore Metro Rail Project. Under this agreement, Delta India will contribute Rs. 65 crore towards the construction of the Bommasandra Metro Station, with an initial payment of Rs. 10 crore already made. As per the agreement BMRCL will be offering the naming rights of Bommasandra Metro Station as ‘Delta Electronics- Bommasandra Metro Station‘ for a period of 30 years

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [2][3][4][5][6]

Station layout[edit]

Station Layout (TBC)

Bommasandra track layout (TBC)
P1
P2
to Train Terminates Here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Train Terminates Here
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Biocon Hebbagodi
Side platform | Doors will open on the left Disabled access
L2

Connections[edit]

Metro station is connected with Heelalige of Indian Railways network.

Entry/Exit[edit]

See also[edit]

References[edit]

  1. ^ https://www.mojo4industry.com/bengalurus-bommasandra-metro-station-to-be-named-after-delta-india/
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 2024-03-09. Retrieved 2024-03-10.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 2023-12-14.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 2023-11-11.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 2023-10-21. ISSN 0971-8257. Retrieved 2023-11-11.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 2023-10-06. Retrieved 2023-11-11.

External links[edit]