Modern Continental

From Wikipedia, the free encyclopedia
Modern Continental
Company typePrivate
IndustryConstruction
Founded1967
FounderLes Marino, Kenneth Anderson
DefunctJune 23, 2008
FateChapter 11 Bankruptcy
SuccessorLM Heavy Civil Construction LLC
Headquarters,
United States
Key people
John Pastore (President)

Les Marino (President 1967 - 2004)

Charlie Madden (Vice President)
ServicesConstruction, Land Development
Number of employees
4,200 (2001)
SubsidiariesModern Continental Enterprises (MCE), Modern Continental Pacific, Spearin Preston & Burrows Inc (SPB)

Modern Continental was a construction company based in Cambridge, Massachusetts, which was involved in the Boston "Big Dig" Central Artery/Tunnel Project. On June 23, 2008, the company filed for Chapter 11 bankruptcy in federal court in Boston.[1]

History[edit]

Modern Continental Construction was a heavy-construction company and the original business in the Modern Continental group. Modern was one of the major contractors on the Central Artery/Tunnel Project, the largest single public works project in United States history. Modern was founded in 1967 by Kenneth Anderson and Italian immigrant Les Marino. On September 23, 2004, Marino announced plans to merge Modern Continental Construction and a subdivision of Jay Cashman, Inc.[2]

Modern Continental Enterprises was a division of the company that built housing developments, built and managed office buildings, operated marinas, operated charter and tendered bus (Paul Revere Transportation) and ferry services *Boston Harbor Cruises), owned and operated an organic produce farm in Natick, Massachusetts, and operated an Italian restaurant (Ristorante Marino) in Cambridge, Massachusetts.[3]

Criticism[edit]

Throughout 2004, Modern Continental Construction endured mounting criticism for its failure to complete multiple projects on schedule and its financial stability was questioned. These including the Route 3 North highway-widening project in northeastern Massachusetts and a major drinking-water pipeline in the San Francisco Bay Area. MCC was to finish the widening of Route 3 in 42 months by early 2005, but incurred delays of an additional 8 months. The State of Massachusetts fined Modern $10,000 for each day the project was unfinished.

The East Bay Municipal Utility District terminated a $24.5 million contract with Modern in early 2004 due to Modern's failure to meet construction schedules, insufficient staffing and oversight, and numerous pipe defects that Modern was unable to correct.[4][a] East Bay Municipal Utility District reversed the termination for cause to a termination for convenience.

Modern was also briefly dropped from Massachusetts' list of highway contractors qualified to bid on state-funded projects. Later that year, questions were raised about the workmanship on a Central Artery contract, for which Modern was the lead contractor, after a large leak was found in the Interstate 93 tunnel beneath downtown Boston which led to the disclosure and discovery of "thousands of leaks."

Ceiling collapse[edit]

On July 10, 2006, four three-ton concrete ceiling panels on Interstate 90 in South Boston, Massachusetts fell onto a car driven by Boston resident Angel Del Valle, injuring him and killing his wife Milena. The ceiling panel collapse has been attributed to the failure of bolts anchored into the structure with an epoxy adhesive from which the panels are hung. Modern Continental built that section of the highway in 1999. (See Big Dig for more details.)

Investigation[edit]

During the period after the ceiling panel collapse, a memo allegedly written in 1999 by John J. Keaveney, a former Modern Continental employee, to his Project Manager warning of the potential for failure of the hanger system was sent to the Boston Globe. Keaveney said that he sent it to the Globe with a current Modern Continental employee's name and office address on the envelope because he feared the consequences if it were known that he provided the newspaper with the memo. "I was worried about the repercussions and that it might affect my family and my livelihood," stated Keaveney.

Bankruptcy[edit]

On June 23, 2008, Modern Continental filed for Chapter 11 bankruptcy in federal court in Boston.

Notes[edit]

  1. ^ While Modern was responsible for determining the location of utilities at the project site, Modern blamed project delays on inaccurate information regarding the location of gasoline pipelines received from Kinder Morgan, an energy infrastructure corporation. These inaccuracies later resulted in an explosion which killed 5 workers from the firm which replaced Modern.[5]

References[edit]

  1. ^ Jewell, Mark. "Big Dig contractor files for bankruptcy protection". The Patriot Ledger. Retrieved 2024-03-28.
  2. ^ "Modern Continental Merges with Jay Cashman | 2004-09-24 | ENR | Engineering News-Record". www.enr.com. Retrieved 2024-03-28.
  3. ^ sydney.primo.exlibrisgroup.com https://sydney.primo.exlibrisgroup.com/discovery/fulldisplay?docid=alma991031404179505106&context=L&vid=61USYD_INST:sydney&search_scope=MyInst_and_CI&tab=Everything&lang=en. Retrieved 2019-04-01. {{cite web}}: Missing or empty |title= (help)
  4. ^ "California Pipeline Blast Delays Troubled East Bay Water System Expansion". Engineering News-Record. November 15, 2004.
  5. ^ Taugher, Mike (22 September 2007). "Corporation to pay $15M for Walnut Creek blast". East Bay Times.